The spaceship of the European start made the orbit. Now it’s lost in the sea

A European company What is looking for orbital Space ship Because Cargo, and will force a step ahead this week with a possible positive proof flight and future successfully before making a controlled atmosphere.

However, because the “issue” company’s company’s company with its spacecraft a few minutes before Touchdown in the ocean.

In an amplient Tuesday morning on LinkedIn, Company characterized the test flight as a partial success – and a partial failure.

“Capsule has been launched, fed the nominally in-orbit load after separation with the launch, reestablished and repacking the communication later” The company told in a statement. I am “Always investigate the root causes and share no more info. Ashamed all our customers that have reliabled with their pages.”

Maybe it was the paralutors

The reservation of communications with the spacecraft after Blackout period has through the most vermical part of the re-enter the land

After this, second The company’s timeline By mission possible, capsules parked to implement to implement at a speed between mach 0.8 and Mach 0.6. Perken words were selice for the principle, and have been expressed by the unagna in use of a franchis, it is paining space and the other national;

Since the spacecraft was lost, it seems more likely that there was a problem with the commitment of employment or main parachute parachute.

Missionibility has been a diameter’s demonstrator vehicle that was between the largest launch loads in transportation 14 from the show of the strength of Vandenberg strength. The mission must four sports primary tests four in structural replenishment in orbital reference, involvement, autonomous nononum. Only clearly failed in this final task, retry the vehicle in three days to get back to the charges on the loads on the clients.

Meeting an aggressive timeline

It’s refreshed for space communication and concipes communication from a space-specially, especially, the recognition that a partial flight, in the hours of Launches. And it’s not a surprise that were the technical challenges on a vehicle that was put in fast enough and a little price.

In the an interview with ars The Founder The Founder of the Founder of Expecting Huby Hubie, he said the mission has been developed at a cost of approximately $ 10 million

At the time, she told the mission possible was on the track of this real, and the company met this timeline.

Give potential problems with the parachute system or other problems near the touchdown, it is possible for the exploration company may win in the development of their full nyx charge NYX charge

Source link