Physical Address
304 North Cardinal St.
Dorchester Center, MA 02124
Physical Address
304 North Cardinal St.
Dorchester Center, MA 02124
Coals, twisted copper wires lie on the pallets in the wire plant (wallpaper) in AURUBIS AG.
Drawing alliance Drawing alliance Gets the image
US president Donald Trump launched the decision on the appeal court temporarily block the transfer of the land required by the mining giants Red river and BHP To develop what is planned to become one of the largest copper mines in the country.
In A pillar On the social media platform, Tuesday, Trump said that the last failure in Arizona’s resolution copper mine will affect thousands of jobs at a time when the world’s largest economy “just requires copper – and now!”
His comments came shortly after he met the leaders of Rio -Tint and BHP in the White House, as well as the secretary of the internal affairs of the Burgum Arc.
The two largest mining firms, Rio Tint and BHP are trying to develop a copper project in Arizona for about two decades, but the procedures have been linked to legal issues.
Appeal Court of the American District Court on Monday removed A temporary restraint to prevent land transfer, while the court reviews the problems brought by opponents, including the San Karlos Apach tribe, which seeks to block the project for religious, cultural and environmental reasons.
“It’s so sad that radical left-wing activists can do so and affect the lives of so many people. Those who have fought with it are anti-American, and represent other competitive copper countries,” Trump said in Truth.
Native American Apache Members Apache firmly in protest cards in front, if officially asking the US Supreme Court to cancel the former ruling that allows Rio Tint to develop a copper mine in Arizona, outside the Washington trial, the US, September 11, 2024.
Pirashka van de Wuy | Reuters
Permission copper described Monday, which comes on Monday as a “just a temporary pause”, adding that the court will eventually confirm the necessary land transfer.
“This proposed mine is a gap, destroying the sacred territory, reduces the environment, threatens our right to water and bad for America,”-Terri Rambler, chairman of the San Carlos tribe, – Note In a message on Facebook.
Addressing the social position of Trump’s truth in the recent court ruling, Rambler said the US president’s comments “mirror misinformation, which was repeated by the interests of foreign affairs who want to extract US copper.”
He added that he was ready to meet the Trump administration to help “protect US interests.”
Arizona copper project is a proposed underground mine approximately 60 miles east of Phoenix, near Superior. The joint venture is 55% owned by Rio Tinto and 45% BHP.
Permission copper speak A red deposit is “one of the most significant unused copper deposits today” and assesses the potential to add $ 1 billion a year of Arizona economy.
Highly favorable metal, copper is the most important component of virtually everything in the modern economy: from solar panels and wind turbines to defense applications and artificial intelligence infrastructure.
Demand for copper is await to grow in the coming years, sharply exceeds supplies Among the transition into the world with low carbon content.
In LinkedIn pillarBHP CEO Mike Henry thanked Trump and Burgum for “for their strong leadership to intensify mining and processing networks to America and America.”
Along with Rio Tinto CEO Jacob Stausholm and Incoming CEO Simon Trot, Henry BHP said he met Trump and Burgum to emphasize the firm’s commitment to develop copper permit.