Physical Address
304 North Cardinal St.
Dorchester Center, MA 02124
Physical Address
304 North Cardinal St.
Dorchester Center, MA 02124
Tesla has signed a treatment of $ 16.5 billion to get their church of the first generation by samsung.
“Samsung’s Giant New Year of Texas will be dedicated to make the next generation Ai6 Chip” Elon Musk submitted on X late Sunday evenings. “This strategic importance is hard for overstate.”
TESA SPORTWARE AI6 (HARDWARE 6) CHIP IS THE COMPANY INTO AWAY INTO DRAWING CAMALY OF THE SOME OF TESLA OF TESLA OF TESLA.
Musk noticed Testla works with TSMC to make A5 chips, who has just finished the design. A15, a generation that is mainly built for FSD. Inicially will be done in Tsmc Taiwan factory and after its Arizona facility. Samsung has already the chip a14, according to the mush.
The deal is a pulse to samsung, who fought to get their chip-making the ground after failing to attract and retain the important customers. Musk said in another post that tesla can end up more than $ 16.5 billion on Samsung chips.
“The actual outcome is likely to be many times as high,” he said.
In a later post, MUSK said that Samsung has agreed to allow the tesla to help maximize manufacturing efficiency.
Techcrunch event
San Francesco
| 0.
October 27-29, 2025
“This is a critical point, while walking the line personally to speed up the rhythm of progress. And the fab became far from my house”